Recent Projects: Completion of Wood Shop concrete 2019
The fall and winter of 2018 we poured the floor and concrete culvert for the wood shop. I am so pleased with the end result of this lengthy renovation project. If you remember, last summer we re-roofed, and our visiting youth groups prepped and staged this floor for the pour. Steve now has 1300 square feet of additional work area, and the finest concrete surface and water drainage on the mission. Thank you again for praying, giving, and laboring with us.
|